Physical Sciences Building (MSI May 29-Aug. Please use caution near crews and equipment. A Conex (storage container) for furniture storage will be staged at the northeast corner of the building, near the dumpsters for the facility. There will be heavy foot traffic along the main stairwell from ground level to the third floor. The contractor will establish a HEPA-equipped negative pressure enclosure at the entrance of the suite in an effort to mitigate dust and odor dispersion to other locations of Old Main during construction. Task items include wall removal and repair, painting, carpeting, electrical routing, moving and cleaning. Old Main (UW Operations August 2018) - Remodeling of Suite 318 of Old Main is underway. Please use caution, and be aware of active renovation zones. A dumpster is located in the stadium parking lot, and one elevator at a time will be out of public use. Wildcatter Re-carpeting (Commercial Flooring) - The Wildcatter carpet is being replaced. Please be cautious of crews and equipment in the area. The sidewalk on the west side of 19th Street may be closed the street will be blocked occasionally. Construction fence is set up around the work area. 20.Ĭentral Energy Plant (CEP) (Arcon Inc., Laramie August 2018) - Construction on a shelter to cover the condensate tank at the CEP began Aug. A portable boiler located north of Washakie Dining Hall will remain on-site until Aug. Most campus buildings between 22nd and Ninth streets, and Ivinson and Lewis streets will not have hot water or steam during the shutdown. 5-11 at the University of Wyoming:Ĭampus Steam Shutdown (UW Operations) - The annual campus steam shutdown began Monday, July 16, and will continue through Aug. These are among the construction activities scheduled Aug.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |